The day you get the keys

Your Cyprus home handover checklist.

The keys, the starting readings, the things still waiting for an answer. Keep them together in a practical checklist you can download or print for your own records.

18 practical checksFree · No sign-upYour notes stay on this page

Cyprus Sorted · Home handover checklist

Your entries stay in this page’s memory and are not saved to browser storage. Download or print a copy before closing or reloading the page. Leave out names, addresses, account numbers, passwords and document details.

Keys & access

Know what you have received and what still needs arranging.

  • Count the keys and remotes

    Unchecked

    Compare the sets handed over with what was agreed. Include shared entrances, post boxes, parking and storage where relevant.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Try the access you will use

    Unchecked

    Ask for a demonstration of doors, gates and shared access. Record missing items here, never passwords or access codes.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Know where to find instructions

    Unchecked

    Ask where appliance manuals, building rules and normal maintenance instructions are kept. Keep contact details in your own records.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

Condition & inventory

Keep a useful record of what is there on the day you take over.

  • Record the condition together

    Unchecked

    Walk through the home and keep dated photos in your own files. Note visible damage, missing items and anything you could not check.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Compare the inventory

    Unchecked

    Check the furniture, appliances and fittings against the agreed list. Record discrepancies before treating the list as agreed.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Ask for equipment demonstrations

    Unchecked

    Ask how heating, cooling and hot water operate, and who handles faults. Leave technical or safety concerns to an appropriate professional.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

Electricity

A meter reading and a supply-account transfer are separate jobs.

  • Record the electricity reading

    Unchecked

    Confirm which meter serves the home and keep a dated photo privately. You can enter the displayed consumption reading below; leave out meter and account numbers.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Confirm the supply-account process

    Unchecked

    Ask the supplier which transfer, reconnection or new-connection process applies and what you need to provide. Taking a reading does not make the account yours.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Check what the supplier has confirmed

    Unchecked

    Keep the application, agreement and activation or account confirmation in your own files. If anything is pending, record the next question instead of assuming it is finished.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

Numbers only, with a decimal point or comma if needed. Record the units, date and photo separately. This does not change the item’s status.

Electricity reading: Not recorded

Water

Record the starting point and check the local provider’s process.

  • Record the water reading

    Unchecked

    Confirm the meter with the person handing over the home. Keep a dated photo privately and, if useful, enter only the displayed reading below.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Identify the water provider

    Unchecked

    Ask which local provider serves the property and confirm its own account-change requirements. Do not assume the electricity process covers water.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Clarify water arrangements

    Unchecked

    Ask what is shared, how charges are handled and who to contact about a leak or interruption. Record any unresolved responsibility.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

Numbers only, with a decimal point or comma if needed. Record the units, date and photo separately. This does not change the item’s status.

Water reading: Not recorded

Internet

Check availability, installation and a working connection separately.

  • Check the exact property’s availability

    Unchecked

    Confirm service availability with your chosen provider. A connection elsewhere in the building or neighbourhood does not confirm your own order.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Agree installation and access

    Unchecked

    Confirm any technician visit, building access and permissions with the provider and the person responsible for the property. Keep the appointment details privately.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Try the connection where you will use it

    Unchecked

    Once active, test a normal call or work task in the room you plan to use. Keep a backup plan for essential work while setup is incomplete.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

Unresolved jobs

Leave each open question with a next step and someone responsible.

  • List the work still outstanding

    Unchecked

    Give each unresolved item a short description and a next action. Use roles such as landlord or provider in these notes, rather than private contact details.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Agree who does what next

    Unchecked

    Confirm responsibility, any agreed cost and the next update with the relevant person. Keep that agreement in your own records; this worksheet is not their confirmation.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

  • Keep your own copy

    Unchecked

    Download or print these notes before closing this page. Share them yourself only after checking what they contain, alongside the records you have kept separately.

    Add a note Optional

    0/200 characters. No private details.

    Notes: ________________________________________________________

Provider processes are separate from these personal checks. EAC distinguishes supply-account transfers from new connections and reconnections; Cyta separates availability, application and installation. Check the process that applies directly with your provider: EAC connections and transfers and Cyta fibre FAQs. Sources reviewed .

This is a personal planning worksheet, not a signed handover report, legal document, safety inspection or confirmation that a utility account has changed. Agree outstanding matters with the relevant person or provider and use qualified professionals where needed. By the Cyprus Sorted team. How we research our resources.